The 1st Online-DAQ Meeting 20/Dec/96 Agenda 1. Organization 2. Frontend DAQs (framework, status, things to be aquired ....) 2.1. 1kton water tank(Y.Itow) 2.2. VETO(Y.Oyama) 2.3. SCIFI(M.Etoh) 2.4. LG(T.Kobayashi) 2.5. Muon(H.Ishii) 2.6. Beam channel(T.Kobayashi) 3. Framework of whole control & DAQ & monitor system (A.Sakai) (including data storage, network, protocol, language) 4. Hardware list (except frontend) 5. To be decided (discussion or home work) 6. TODO 7. Schedule 8. Discussion ================ * ================ * =============== *************** 1. Organization *************** DAQ working group consists of core (actual working) persons + at least one person from other working groups. CORE : M.Kohama(Kobe), A.Sakai, T.Kobayashi(INS), M.Shiozawa(ICRR) 1kton : Y.Fukuda, Y.Itow, M.Miura, Y.Suzuki (ICRR) VETO : Y.Oyama(KEK) SCIFI : M.Sakuda(KEK), Aoki(Kobe) LG : T.Kobayashi(INS) Muon : H.Ishii(INS) Beam : T.Maruyama(Tohoku) Offline: T.Ishida(KEK) O.Sasaki, Chan kee, Wilkes, K.Nishikawa Adviser: Y.Yasu(KEK-Online) The existing mailing list "e362daq@pnahp.kek.jp" is redefined to include the above persons. Of course, you can freely request to be in the list if you are interested in this subject. *************** 2. Frontend DAQ *************** Latest configuration of frontend DAQ system of each detector component including a scheme of calibration were reported. 1kton: use TKO-ATM module + VME + Sun. Calib. can be done between the beam spills without any modification to the frontend electronics. VETO : 300ch in total. VME TMC(TDC mod.) + same ADC as LG-ADC. SCIFI: Flash ADC + VME FIFO. Sakuda(or ??) will check the possiblity of doing calibration using cosmic-ray muons between the beam spills. LG : TKO-ADC or FASTBUS-ADC(not yet decided). Calibrate with Xe lamp between beam spills. Muon : frontend elec. board(atatched to chamber) + TKO memory module. Calibrate by using beam induced muons *********** 3. Sakai reported the framework of whole DAQ system. *********** DAQ system will be composed of network-connected VME computers, a host workstation, and some monitor WSs. ================ * ================ * =============== The following sections were not disscussed deeply. ================ * ================ * =============== 4. Hardware list (except frontend) necessary present FD o VME crate 3 (1kton x 1 + FDx2) 1 o VME board computer 2 (Fine grainx2) 1(HP743rt) o 1kton onl. WS 1 (Sun?) o 1kton Sun-VME IF 1 o FASTBUS FPI 1 1 o FASTBUS-VME IF 1 1 o FD onl. host WS 1 (HP/PC?) o FD monitor WS 1 or 2(Sun/PC?) o Storage(if local) ?? Beam channel o CAMAC crate 5-10 o Onl. WS 6-15(PC) o VME crate 1 1 o VME board comp. 1 1 o Host WS(cntrl,mon.) 1(HP/PC) ================ * ================ * =============== 5. To be decided (homework) o What should be online-monitored? o Data storage(local/CCPS) o Network configuration(FDDI/ether, private/public) o Data transfer protocol (NOVA?) o Type/OS of online computers(HP/PC/Sun) o Language for software o data format ================ * ================ * =============== 6. TODO o Aquire hardware o Hardware test o Development of online-DAQ software o DAQ test of each component o Test of whole system ============================================================ * Itow pointed out that we should consider slow control also.